D3.3 Open call evaluation report 1.0
< 1 min read

This deliverable presents the outcomes of the 1st Better Factory Open Call as well as the structure of theevaluation process. The process included the eligibility check, external experts scoring, consensus meetings and finally a Jury Day with project partners, which allowed the selection of the final 7 beneficiary consortia to […]

D3.2 Open Call outcome report 1.0
< 1 min read

This deliverable presents the outcome of the first Better Factory Open Call, including the selected Knowledge Transfer Experiments (KTEs), their teams, countries, among other details.

D3.1 Call Announcement and Guide for Applicants 1.1
< 1 min read

This deliverable is a continuously updated document that will include all the documents needed for the 1st Open Call for funding up to 8 Knowledge Transfer Experiments (KTE). The first version of this deliverable contains the Package of Documents for the preliminary individual calls to select Manufacturing SMEs/Mid-Caps (through Expressions […]

D2.6 User protection processes and mechanisms 1.0
< 1 min read

The purpose of this document is to provide the overview of what approaches RAMP has in place to protect the users and companies in RAMP, especially in regard to their collaboration with other companies within the platform. The document is not concerned with the technical aspects (e.g. technical means for […]

D1.2 Integrated factory digital twin designer on RAMP 1.0
< 1 min read

This document aims to act as an “Integration of the APM in the RAMP Marketplace and a guide how to use it” and is the output of Task “T1.2 Factory digital twin designer”, M1-M45. The Advanced Plant Model (APM) is a system developed by INESC TEC that aims to provide […]

D2.5 Usability requirements 1.0
< 1 min read

Usability is important for the adoption of any system, especially for web-based platforms. RAMP is meant to be easily used online by Manufacturing SMEs and Providers in the automation value chain (i.e., System integration, Automation Systems, Robotics developers, Consultants, etc.), and, as such, usability should be considerably taken into account. […]

Photo by Leon on Unsplash
D1.3 Analysis of SME training needs version 1.0
< 1 min read

This document describes a needs analysis and a training methodology to support the absorption of skills for implementing the Better Factory KTEs experiments, and from adopting cyber-physical systems and collaborative robots’ technologies to maximize agility in production for the personalization of products through agile manufacturing based on the marketplace RAMP.

D4.2 APPS architecture version 1.0
< 1 min read

APPS (Advanced Production Planning and Scheduling) system is the platform that is implemented in the Better Factory project. APPS aims to provide a complete digital infrastructure needed by manufacturing SMEs to deploy cognitive HRI, logistics automation and optimization, resource optimization and production reconfiguraiton. The architecture of APPS is given in […]

D2.2 SME and artists co-creation space version 1.0
< 1 min read

RAMP aims to accelerate production in Manufacturing SMEs by providing access to services and tools for digitization and collaboration. In the Better Factory project, RAMP aims to enhance the co-creation of automation solutions and novel product design services. In order to implement this concept, two tools are developed:  1. Tender […]

D7.1 RAMP business plan 1.0
< 1 min read

This deliverable introduces the current business hypothesis which will be tested in the Better Factory project. These hypotheses are based on the business development activities carried out in L4MS and DIH² projects. Business development activities will be continued in the Better Factory project the focusing on activities of testing and […]

D6.3 PEDR 1.0
< 1 min read

D6.1 Is the first report that is prepared at M6 to coordinate dissemination of open calls (T6.2) and marketing of project results (T6.3) strategies. This Report will be updated during the project implementation, including ‐in the Interim Reports‐ the concrete dissemination and exploitation activities carried out. The final version of […]

D8.4 Better Factory ethical report version 1.0
< 1 min read

This deliverable describes the ethical procedures and tools to be used in the Better Factory project to ensure that the project will follow the relevant ethical and safety standards. The report covers the following aspects: • The involvement of human participants. Procedures for ethics assessment and review. • Personal data […]

See more
lines